Researchprojects

  • Home /
  • Researchprojects /
  • BAB 002/86: Preparation of documents for the mountain farm cadastre (BHK) and the severity point system

  • Home /
  • Researchprojects /
  • BAB 002/86: Preparation of documents for the mountain farm cadastre (BHK) and the severity point system

BAB 002/86: Preparation of documents for the mountain farm cadastre (BHK) and the severity point system

Ongoing cooperation in the "Federal Commission for the Survey and Evaluation of the Hardship Conditions of Mountain Farms" (BUKO) as well as in the editorial and project team of the BUKO was the focus of this project for many years. Documents were prepared for the BUKO, the editorial team and the BMLFUW, especially in connection with the implementation of the mountain farm cadastre. In recent years, the focus has been on implementing the concept of aggravating points for all farms in the LFA, i.e. for mountain farms and non-mountain farms.

In the years 2011 to 2018, current issues were dealt with on the topic of the "regional location of the farm", the amendment of the Mountain Farming Ordinances, the need for adaptation of the BHK and the discussion of the concept, the implementation variants and the implementation of the system of severity points for all farms in the LFA. The system of severity points has replaced the system of mountain farm cadastral points. However, the classification and presentation of mountain farms in groups is still necessary in order to be able to present the structural and income development of mountain farms.

Within the framework of this project, depending on the need for adaptation and analysis of the system of severity points for all farms in the less-favoured area (mountain area, other less-favoured area, small area) and the presentation of the mountain farms within the framework of the severity point system, the processing will be carried out in cooperation with the competent department.

The long-term project 002/86 (preparation of documents for the mountain farm cadastre (BHK) and the severity point system) was terminated at the end of 2019. The severity point system and the current LFA area map have been established and therefore there does not appear to be any major need for research activities for the AOD in 2020.

Translated with www.DeepL.com/Translator (free version)

Project Status

finished

Project Leader

HOVORKA, Gerhard

Dr. Gerhard HOVORKA

former employees

Team

TAMME, Oliver

M.Sc. Oliver TAMME

Mountain Areas Research and Regional Development
Dietrichgasse 27
1030 Wien
 +43 (1) 71100 - 637415

© 2024 bab.gv.at. all rights reserved